Blueprint assignments for “trunk”

This listing shows the assignment of work for blueprints currently associated with trunk. The drafter is responsible for getting the specification correctly written up and approved. The approver is usually the person who would sign off on the specification.

17 of 7 specifications
Priority Name Definition Delivery Assignee Drafter Approver
5 Essential Standardise the names used within CalcPad to describe the document 0 Approved 5 Started thomas michael wallace thomas michael wallace thomas michael wallace
3 Medium Interface aspects should be separated from CalcPad workings 0 Approved 5 Started thomas michael wallace thomas michael wallace thomas michael wallace
3 Medium Tidy code to PEP Standard 0 Approved 11 Implemented thomas michael wallace thomas michael wallace thomas michael wallace
3 Medium CalcPad Windows Release 6 Superseded 3 Needs Infrastructure thomas michael wallace thomas michael wallace thomas michael wallace
2 Low Calcpad needs some branding 0 Approved 11 Implemented thomas michael wallace thomas michael wallace thomas michael wallace
2 Low Standardise the external functions required of each CalcPad object 0 Approved 8 Beta Available thomas michael wallace thomas michael wallace thomas michael wallace
2 Low Change CalcPad to a Web App 3 Drafting 3 Needs Infrastructure thomas michael wallace thomas michael wallace thomas michael wallace
17 of 7 specifications