Blueprint workload

This page lists the specifications that Mat Tomaszewski is expected to work on, or is its creator.

Priority Specification Definition Delivery Assign Draft Approve
3 Medium foundations-lucid-installer-design-improvements 3 Drafting 0 Unknown      
3 Medium foundations-lucid-update-on-shutdown 3 Drafting 2 Deferred      
2 Low foundations-karmic-migration-assistant 0 Approved 2 Deferred      
2 Low foundations-m-install-updates-when-installing 0 Approved 1 Not started      
1 Undefined lucid-online-status 4 Discussion 3 Needs Infrastructure      
1 Undefined wallpaper-contest 5 New 0 Unknown