Manufacturing functional improvements
(manufacturing profile + demo data + mrp_operations installed)
1/ When there are several operations in a prod order (=> several WO), we can finish the second one without starting the first one. I think that a message should appear to ask whether the first WO has to be automatically finished or not.
2/ In the case there are several WO (for the same prod order = same MO) and 1 has been finished, while another one is still draft, the "WO to do" list doesn't display the second one (status = draft), but the "Future WO" list does. I think that this difference must not exist. The only difference between both lists must be driven by the scheduled date.
3/ I think that we should be able to split WO depending on the qty actually produced. Today, it's only possible to finish the whole WO or to let it "in progress".
Blueprint information
- Status:
- Not started
- Approver:
- None
- Priority:
- Undefined
- Drafter:
- None
- Direction:
- Needs approval
- Assignee:
- None
- Definition:
- New
- Series goal:
- None
- Implementation:
- Unknown
- Milestone target:
- None
- Started by
- Completed by