Blueprint assignments for “11.05”

This listing shows the assignment of work for blueprints currently associated with 11.05. The drafter is responsible for getting the specification correctly written up and approved. The approver is usually the person who would sign off on the specification.

110 of 10 specifications
Priority Name Definition Delivery Assignee Drafter Approver
4 High Investigate enhancing and tune GCC auto-vectorization capabilities for NEON 0 Approved 11 Implemented Ira Rosen Ira Rosen Michael Hope
4 High Linaro GCC 4.6 0 Approved 11 Implemented Andrew Stubbs Michael Hope Michael Hope
4 High Integrate the EEMBC benchmarks 0 Approved 11 Implemented Michael Hope Michael Hope Michael Hope
3 Medium Linaro GCC 4.5 in Distributions 0 Approved 11 Implemented Andrew Stubbs Michael Hope Michael Hope
3 Medium Integrate SPEC CPU2006 benchmarks 0 Approved 11 Implemented Michael Hope Michael Hope Michael Hope
3 Medium Continue improving Thumb-2 performance 0 Approved 11 Implemented Michael Hope Michael Hope Michael Hope
3 Medium Add swing modulo scheduling support 2 Review 11 Implemented Revital Eres Michael Hope Michael Hope
3 Medium Follow up to the 2011.01 x86_64 incident 3 Drafting 11 Implemented Michael Hope Michael Hope Michael Hope
3 Medium Efficient use of NEON specialized load and store instructions in GCC 3 Drafting 11 Implemented Richard Sandiford Ira Rosen Michael Hope
1 Undefined Some missing A9 backend features. 6 Superseded 5 Started Ramana Radhakrishnan Michael Hope
110 of 10 specifications